Shandong Xiangpeng Industry and trade Co., LTD微信
ChineseChinese EnglishEnglish
infomation
tel咨询热线:+86-15763009888

Product

Enquiry telephone

+86-15763009888

Shandong Xiangpeng Industry and trade Co., LTD

Add:Shandong Weifang City Hanting District Tongting Heng (206 National Road) and Weifang City east outer ring Road intersection 500 meters east road south

Contact
Integrated rotary-plastic double urn funnel septic tank

Integrated rotary-plastic double urn funnel septic tank

+86-15763009888
Shandong Xiangpeng Industry and trade Co., LTD
www.jianchajingwang.com
2023-8-8 148

Information details

一体化滚塑双瓮漏斗式化粪池

一体化滚塑双瓮漏斗式化粪池1

How it works:


The basic structure of the double urn septic tank is mainly composed of a funnel-shaped toilet, two urn-shaped storage tanks before and after, connecting pipes (through the fecal pipe), the back urn cover and the toilet room. The funnel-shaped urinal is placed at the stool inlet of the front urn. A stool tube is connected under the toilet to the front urn outside the toilet. The front urn is used to receive and store feces. And remain valid for more than 40 days. The feces were fully anaerobic fermented and stratified by precipitation in the front urn. Fecal parasite eggs and pathogenic microorganisms are gradually killed to achieve basic harmless requirements. The rear urn is mainly used to store fecal liquid.


Main features:


1, volume 1.0-1.5m3, in line with the "o/SWY010-2015 double urn funnel septic tank" standard.


2, optimized structure design, mature process technology, high product strength, acid and alkali resistance. Anti-corrosion.


3, roll molding once, do not use the urn body docking, to solve the problem of leakage.


4, save labor, time, long service life.


Installation instructions:


1. Dig a cuboid pit 2 meters long, 1.1 meters wide and 1.8 meters deep outside the toilet at the position corresponding to the indoor squat toilet or toilet, and use 50mm concrete as the foundation. ,


2. Put the urn body into the pit dug in the toilet room and use it around the urn body


The fine soil is filled and tamped to prevent the collapse and tilt of the urn body. The urn body is 5-10 cm higher than the ground. Cement mortar is used to reinforce the urn cover to prevent seepage and fix it.


3, adjust the position of the mouth of the stool pipe, the stool pipe is connected between the urn and the urn, and the special pipe fittings are connected at the connection between the stool pipe and the urn body to play a fixed role in preventing seepage.


4, please first adjust the bottom of the high pressure flushing device, the bottom should be completely consistent with the high pressure flushing device, can not shake, adjust the foot pedal to ensure its stability, check whether the outlet hose and lock is firm, the depth of the high pressure flushing device slightly higher than the ground (about 20mm)


5, high pressure flushing toilet and squatting toilet connected to the water pipe < exposed part of the bucket) should be as short as possible, not bending, not sagging, squatting toilet flushing mouth should be higher than the water storage bucket < must have a height difference), otherwise, the winter water pipe will store water resulting in freezing.


7. The front end of the squat toilet should be slightly higher than the back end of 5-10mm, and the squat toilet should be tamped with fine sand around it and then levelled with 2cm cement mortar.


8. The linear distance between the outlet of the toilet and the entrance of the front urn is less than 1.2 meters, and the height difference between the toilet and the urn is 0.3-0.5 meters.


Related products