Shandong Xiangpeng Industry and trade Co., LTD微信
ChineseChinese EnglishEnglish
infomation
tel咨询热线:+86-15763009888

Product

Enquiry telephone

+86-15763009888

Shandong Xiangpeng Industry and trade Co., LTD

Add:Shandong Weifang City Hanting District Tongting Heng (206 National Road) and Weifang City east outer ring Road intersection 500 meters east road south

Contact
Integrated injection molding three-format septic tank

Integrated injection molding three-format septic tank

+86-15763009888
Shandong Xiangpeng Industry and trade Co., LTD
www.jianchajingwang.com
2023-9-18 163

Information details

1

一体化注塑三格式化粪池

Main features:


1, the volume of 1.0-1.5m3, in line with the "o/swY011-2015 three-format septic tank" standard.


2, the design concept is advanced, the partition plate up and down staggered layer design, sewage circulation type flow, three cell volume distribution ratio of 2∶1∶3, sewage treatment capacity than the same volume of traditional septic tank at least two times more.


3, optimized structure design, mature process technology, high product strength, acid and alkali resistance, anti-corrosion.


4, save water, each flushing water consumption of about 0.3 liters. 5, no odor, no maggots, no leakage, no pollution of groundwater.


6, the sealing and fastness of the product is good, to ensure the function of anaerobic manure.


7, harmless treatment of feces, to avoid the spread of various diseases, can prevent air, soil, water pollution, protect the environment.


8. Light. Easy to transport, easy to install fast.


9, save labor, save time, long service life.


Installation instructions:


1. Dig a cuboid pit with a length of 2 meters, a width of 1.4 meters and a depth of 1.2 meters, and use 50mm concrete as a cushion layer.


2. Put the three-cell septic tank flat, connect the chemical manure pipe and exhaust pipe, and the exhaust pipe should be 20-50cm higher than the toilet house.


3. The backfill soil should be semi-dry and semi-wet, tamped layer by layer, and backfilled layer by layer until the ground level to prevent the collapse of the urn body. Tilt. Fill the soil should be carried out in two times: backfill half to a depth of 0.6m, sprinkle a small amount of water to tamp and level, and then fill the soil twice to the surface level. The top three exits are 5-10 cm higher than the ground, and cement mortar is used around the exit cover to strengthen the anti-seepage fixing effect.


4. The bedpan should be parallel around the installation, and the longitudinal direction should be high before and low after the installation (5° inclination >) to ensure that the bedpan does not leave water after flushing. The distance between the back end of the bedpan and the wall should be between 20-25cm, and the external insulation layer should be added to the bedpan in cold areas. The squat toilet around the first with fine sand, and then with 2 cm cement mortar leveling.


5, the installation of water storage barrel outlet pipe must ensure natural placement, not S-shaped laying, to prevent water icing. The water storage bucket should be placed behind the bedpan. When installing the indoor water storage bucket, the bucket cover is 10cm lower than the ground. The bucket cover can be covered with thermal insulation materials. When backfilling, the water storage bucket should be filled with water first, and then filled with earth and tamped.


Related products