Shandong Xiangpeng Industry and trade Co., LTD微信
ChineseChinese EnglishEnglish
infomation
tel咨询热线:+86-15763009888

Product

Enquiry telephone

+86-15763009888

Shandong Xiangpeng Industry and trade Co., LTD

Add:Shandong Weifang City Hanting District Tongting Heng (206 National Road) and Weifang City east outer ring Road intersection 500 meters east road south

Contact
Integrated injection molding double urn funnel septic tank

Integrated injection molding double urn funnel septic tank

+86-15763009888
Shandong Xiangpeng Industry and trade Co., LTD
www.jianchajingwang.com
2021-11-4 66

Information details

一体化注塑双瓮漏斗式化粪池

一体化注塑双瓮漏斗式化粪池

Main features:


1, volume 1.0-1.5m3, in line with the "o /swY010-2015 double urn funnel type septic tank" standard.


2, advanced design concept, sewage circulation flow. The sewage treatment capacity is at least two times higher than that of traditional septic tanks of the same volume.


3. Optimized structure design, mature process technology, high product strength, acid and alkali resistance, anti-corrosion.


4, save water, each flushing water consumption of about 0.3 liters.


5, no odor, no maggots, no leakage, no pollution of groundwater.


6, the sealing and fastness of the product is good, to ensure the function of anaerobic manure.


7, harmless treatment of feces, to avoid the spread of various diseases, can prevent air, soil, water pollution, protect the environment.


8, light, easy to transport, easy to install fast.


9, save labor, save time, long service life.


Installation instructions:


1. Dig a cuboid pit 2 meters long, 1.1 meters wide and 1.8 meters deep outside the toilet at the position corresponding to the indoor squat toilet or toilet, and use 50mm concrete as the foundation. 2. After the sealing gasket is placed at the joint, the urn body is docked first, and then reinforced with screws.


3, put the urn body into the pit dug in the toilet room, the urn body is filled with fine soil and tamped around to prevent the urn body from collapsing and tilting, the urn body is 5-10 cm above the ground, and the urn cover is reinforced with cement mortar to play a fixed role in preventing seepage.


4. Adjust the position of the mouth of the stool tube, connect the stool tube between the urn and the urn, and connect the stool tube and the urn


The joint of the body is connected with special pipe fittings to play a fixed role in preventing seepage.


5, please adjust the bottom of the high pressure flushing device, the bottom should be completely consistent with the high pressure flushing device, can not shake, adjust the pedal. Ensure its stability, check whether the outlet hose and lock are firm, the depth of the high pressure flushing device slightly higher than the ground (about 20mm)


6. The water pipe < exposed part of the bucket > connected to the high-pressure flushing toilet and the squatting toilet should be as short as possible, not bent, not sagging, and the flushing port of the squatting toilet should be higher than the water storage bucket (there must be a height difference). Otherwise, the water pipe will be frozen and cracked in winter.


7. The front end of the squat toilet should be slightly higher than the back end of 5-10mm, and the squat toilet should be tamped around with fine sand and then levelled with ⒉ cm cement mortar.


8. The linear distance between the outlet of the toilet and the entrance of the front urn is less than 1.2 meters, and the height difference between the toilet and the urn is 0.3 to 0.5 meters.


Related products