Shandong Xiangpeng Industry and trade Co., LTD微信
ChineseChinese EnglishEnglish
infomation
当前位置当前位置: 首页   -   Three-form septic tank
tel咨询热线:+86-15763009888
Building community septic tank Septic tank for rural dry latrine renovation

Product

Enquiry telephone

+86-15763009888

Shandong Xiangpeng Industry and trade Co., LTD

Add:Shandong Weifang City Hanting District Tongting Heng (206 National Road) and Weifang City east outer ring Road intersection 500 meters east road south

Contact
Three-form septic tank

Three-form septic tank

+86-15763009888
Shandong Xiangpeng Industry and trade Co., LTD
www.jianchajingwang.com
2016-4-28 13:29:58 71

Information details

Integrated injection molding double urn funnel septic tank

Main features:

1, volume 1.0-1.5m 3, in line with the "Q /SWY010-2015 double urn funnel type septic tank" standard.

2, advanced design concept, sewage circulation flow, sewage treatment capacity than the same volume of traditional septic tank at least two times more.

3, optimized structure design, mature process technology, high product strength, acid and alkali resistance, anti-corrosion.

4, save water, each flushing water consumption is 0.

About three liters.

5, no odor, no maggots, no leakage, no pollution of groundwater.

6, the sealing and fastness of the product is good, to ensure the function of anaerobic manure.

7, harmless treatment of feces, to avoid the spread of various diseases, can prevent air, soil, water pollution, protect the environment.

8, light, easy to transport, easy to install fast.

9, save labor, save time, the service life can reach more than 50 years.

Installation instructions:

1. Dig a cuboid pit 2 meters long, 1.1 meters wide and 1.8 meters deep outside the toilet at the position corresponding to the indoor squat toilet or toilet, and use 50mm concrete as the foundation.

2. After the sealing gasket is placed at the joint, the urn body is docked first, and then reinforced with screws.

3, put the urn body into the pit dug in the toilet room, the urn body is filled with fine soil and tamped around to prevent the urn body from collapsing and tilting, the urn body is 5-10 cm above the ground, and the urn cover is reinforced with cement mortar to play a fixed role in preventing seepage.

4, adjust the position of the mouth of the stool pipe, the stool pipe is connected between the urn and the urn, and the special pipe fittings are connected at the connection between the stool pipe and the urn body to play a fixed role in preventing seepage.

5, please adjust the bottom of the high pressure flushing device, the bottom should be fully consistent with the high pressure flushing device, can not shake, adjust the pedal, indeed

To ensure its stability, check whether the outlet hose and lock are firm, and the depth is slightly higher than the ground at the upper mouth of the high-pressure flush device (20mm left)

Right is OK)

6. The water pipe (exposed part of the bucket) connected to the high-pressure flushing toilet and the squat toilet should be as short as possible, not bent, not sagging, and the squat toilet flushing outlet

It should be higher than the water storage bucket (there is a height difference), otherwise, the water pipe will store water in winter and lead to freezing and cracking.

7. The front end of the squat toilet should be slightly higher than the back end of 5-10mm, and the squat toilet should be tamped with fine sand around it and then levelled with 2cm cement mortar.

8. The linear distance between the outlet of the toilet and the entrance of the front urn is less than 1.2 meters, and the height difference between the toilet and the urn is 0.3-0.5 meters.


Related products